IMPORT OF OBJECTS

Feel free to talk about anything and everything in this board.
Post Reply
HWBerlemann
Old Timer
Posts: 6
Joined: Tue Mar 03, 2015 4:19 am

IMPORT OF OBJECTS

Post by HWBerlemann »

This is a newbie speaking.
Can I import objects from Projects and interactivity build a gear set. For example: Project A is an Auto Train product providing a gear reduction drive. Project B is a GENEVA gear. IMPORT objects from Project A and Project B into a Project C to produce the finished item. It would be A GENEVA drives fed, gear reduction transmission. I don?t expect either to be right the first time through and would like to work on each in a less complex environment finally ending up with a Project C that I can precede model with a 3D printer.
User avatar
ArtF
Global Moderator
Global Moderator
Posts: 4648
Joined: Sun Sep 05, 2010 6:14 am
Contact:

Re: IMPORT OF OBJECTS

Post by ArtF »

Hi:

Im sorry, but you cannot yet do that. Till now the complexity level was such that few would want to separate
projects into modules. But I do see your point and can see where that would be handy to have. I have added this to
the fall list for development. It isnt all that hard to arrange in terms of the load/save, just a matter of not removing the
previous load when loading a new project. A checkbox would be all I need to add for that really. the more complex
item is a database change to allow for a floating linkage variable so you dont have to keep relinking the animation queue.

 
 
Art
HWBerlemann
Old Timer
Posts: 6
Joined: Tue Mar 03, 2015 4:19 am

Re: IMPORT OF OBJECTS

Post by HWBerlemann »

Thanks for quick reply
Bill
Post Reply

Who is online

Users browsing this forum: No registered users and 2 guests